Know-how

Four steps, from design to erection. Steel is designed, fabricated and treated in our Bargny plant, then erected on your site by our crews.

PL-SSteel processing workshopRev. A

Engineering design

Every structure is designed to order, from your drawings or simply from your dimensions.

01Design office

Design
Made to order
Model
3D before fabrication
Calculation
NF EN 1993
Drawings
Submitted for your approval
Output
Marked shop drawings
External inspection body
Optional

Further reading (in French)Conception & ingénierie : tout commence au bureau d'études

Elevation drawing, SAS design office
Elevation drawing of a row of portal frames, SAS design office
PL-S1Engineering design, design officeRev. A

Steel fabrication

Cutting, drilling, bending, welding: every part goes through these stations of the Bargny workshop. The capacities are those of the machines.

Plasma cutting of a plate on the CNC table
02

Cutting

The CNC table cuts plates by plasma or oxy-fuel. The guillotine handles thinner sheets.

CNC table
12 000 × 3 000 mm
Plasma
up to 50 mm
Oxy-cutting
up to 150 mm
Guillotine
6 m × 15 mm
CNC drill at work on a steel plate
03

Drilling

The CNC drill bores end plates and section webs to the drawing dimensions, with no rework on site.

Bed
2 000 × 1 500 mm
Max. diameter
Ø 50 mm
Thickness
50 mm
SAS operator at the press brake console
04

Bending and rolling

The press brake forms sheets and profiles. The rolling machines roll tubes and tank shells.

Press brake
6 m, up to 12 mm
Plate roller
2 m × 20 mm
Section roller
tubes up to Ø 150 mm
05

Welding

The arc robot welds the plate girders. Welders assemble parts on jigs, then the straightening machine corrects distortion.

Robot
Arc welding
Stations
Automatic and semi-automatic
Parts
Plate girders, end plates, trusses

Surface treatment

After shot blasting, which prepares the surface, the steel receives the protection chosen for the structure: paint, powder coating or galvanising.

Preparation

Beam leaving the shot-blasting machine

06Shot blasting

Surface preparation, in the plant

The blasting machine fires steel micro-shot at the parts, before any finish. The surface comes out clean and rough: paint or powder bonds better and holds longer.

Protection

  1. SAS painter beside painted beams in the workshop

    07Paint

    In the plant

    Liquid paint is applied in the workshop to the shot-blasted parts. It suits long parts and can be touched up on site after erection.

  2. Steel parts on a trolley in the powder-coating oven

    07Powder coating

    In the plant, 12 m oven

    Powder paint is applied to the part, then cured in the oven. The finish resists impact and keeps its surface hardness.

  3. Galvanised sigma profiles stacked in the workshop

    08Galvanising

    Cold in the plant, hot-dip subcontracted

    Parts are cold galvanised in the plant to resist corrosion. Hot-dip galvanising is subcontracted.

Further reading (in French)La Galvanisation à froid : protéger l'acier pour construire durablement

Service life of steel by protection

Unprotected steel30 to 50 years
Maintained paint50 to 80 years
Hot-dip galvanising (subcontracted)100 years and more

Orders of magnitude published by SAS.

PL-S2Surface treatmentRev. A

Erection and maintenance

SAS crews erect the structure on your site. Delivery is turnkey, with a single point of contact from design to handover.

Time-lapse of the TOM Medlog warehouse erection
09

The marked parts leave Bargny and are erected on site to the drawings. The SAS project manager follows the structure through to handover.

SAS also maintains and services roofs, for example re-roofing with insulation and preparation for solar panels.

Delivery
Turnkey
Contact
A single one, from design to handover
Inspection
Thickness, welds, dimensions
Follow-up
Dedicated project manager
PL-S3Erection on siteRev. A

Checked before it leaves.

Thickness measurement, visual and dimensional inspection, weld checks: every part is inspected in the workshop. Connections are designed to NF EN 1993 (Eurocode 3).

ISO 9001Quality managementAudited by Bureau Veritas
ISO 14001Environmental managementAudited by Bureau Veritas
ISO 45001Occupational health and safetyAudited by Bureau Veritas